Sorry, no before pictures on this one. Walked into this project, plumbing was roughed in and tub sitting there. Walked out 5 days later with bathroom complete. Bathroom has simple fixtures but is clean and highly functional.
- Bathrooms Renovations
- /Finish Carpentry
- /Flooring
- /General Renovations/ Restorations
- /Kitchen Renovations
- /Painting
- /Plaster Repair
- /Rough Carpentry/Framing
- /Special Projects
- /Tile
-
-
Walk In Bathtub #2
No before pictures on this one folks! You will have to take my word for it, conventional tub in the same space, changed to walk in tub. Out with the old, in with the new. The modern walk in tub allows those whose mobility isn’t what it used to be enjoy a warm luxurious bath […]
-
Walk In Bathtub #1
When getting up and down in a bathtub becomes difficult, the answer may be a walk-in bathtub. Here we were asked to change out the old tub for a walk in. After removing the old tub and surround, we reconfigured plumbing and installed the new tub. We then drywalled the surround, primed it, and tiled […]
-
Bathroom Renovation #2
This project involved the conversion of a room on the 3rd floor of a period home into a bathroom with laundry facilities. We started by stripping the room down to studs. From there we ran our plumbing, electrical and venting for fan and dryer. After re-sheeting the floor, we insulated and installed vapour barrier, the tub […]
-
Shower Install with Tile Surround
On this project, we boarded the walls with cement board, waterproofed with Schluter Kerdi, tiled the surround with 3″x 12″ ceramic tile complete with accent border. After grouting, the grout was sealed and the Fleurco glass door/shelving system was installed, complete with silicone alone all edges. gorgeous!!
-
Bathtub Surround
On this project, the old tile was simply in poor shape, needing to be redone as well as the pump having failed years prior with no way to access it. As such, we replaced tile and tile edge and new grout. When combined with new taps and removable woodwork to better access pump/heater, this bathtub […]
-
Bathroom Renovation #1
This project involved the conversion of a conventional washroom with bathtub, to a roll in barrier free washroom with shower. With the room stripped down, the plumber started on the plumbing, installing a Toto wall hung toilet and Grohe shower valve, with wand and rain head. The electrician added a pot light in the shower and a […]
-
Custom Shower Stall
On this project, we were asked to do a custom shower pan and curb, waterproofed walls and the entire project tiled complete with Fleurco shower doors. To start we leveled the floor underneath the shower tray. Starting with a level surface is key to a good install through all stages. Next we installed a Schluter […]