Here we were asked to redo a laundry area/entrance way. Sorry, no before pictures. The project included the following; heated floor using the new Ditra Heat by Schluter Systems, ensuring even spacing between wires. Porcelain tile on floor complete with tile baseboard and brushed nickel tile edge. Custom cabinetry to house new washer/dryer, along with cubby […]
- Bathrooms Renovations
- /Finish Carpentry
- /Flooring
- /General Renovations/ Restorations
- /Kitchen Renovations
- /Painting
- /Plaster Repair
- /Rough Carpentry/Framing
- /Special Projects
- /Tile
-
-
Basement Renovation #1
Here we were asked to bring this basement up to speed with a facelift. We started by gutting the walls, removing the cedar and old door. We then drywalled the walls and ductwork, priming and painting them two coats with Benjamin Moore Aura. Next came the drop ceiling complete with LED fixtures, followed by doors […]
-
Bathroom Renovation #2
This project involved the conversion of a room on the 3rd floor of a period home into a bathroom with laundry facilities. We started by stripping the room down to studs. From there we ran our plumbing, electrical and venting for fan and dryer. After re-sheeting the floor, we insulated and installed vapour barrier, the tub […]
-
Bathtub Surround
On this project, the old tile was simply in poor shape, needing to be redone as well as the pump having failed years prior with no way to access it. As such, we replaced tile and tile edge and new grout. When combined with new taps and removable woodwork to better access pump/heater, this bathtub […]
-
Bathroom Renovation #1
This project involved the conversion of a conventional washroom with bathtub, to a roll in barrier free washroom with shower. With the room stripped down, the plumber started on the plumbing, installing a Toto wall hung toilet and Grohe shower valve, with wand and rain head. The electrician added a pot light in the shower and a […]
- « Previous
- 1
- 2